OpenSmall BusinessCombined Synopsis/Solicitation
Upgrade UPS & Cooling System
W7N9 USPFO ACTIVITY WYANG 153DEPT OF DEFENSE / DEPT OF THE ARMY / W7N9 USPFO ACTIVITY WYANG 153
AI quick read
Get a plain-English summary, the key facts a bidder needs, and who it's a fit for.
- Posted
- Jun 1, 2026
- Response deadline
- Jun 30, 2026, 12:00 PM EDT
- Due in 23 days
- Value
- —
- Category
- Electrical Equipment
- NAICS
- 335999
- PSC / Class
- 6150
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Place of performance
- Cheyenne, Wyoming
- Solicitation #
- W50S8W-26-Q0001
- Archive date
- Jul 15, 2026
Search tags
Market context
- Open in NAICS 335999
- 97
- 1 in Wyoming
- Typical award (NAICS)
- $350,000
- median of 57 awards
- Recent winners
- —
Description
The vendor shall provide un-installation of outdated equipment and installation of brand-new items according to acceptable standards. Contractor shall provide Uninterruptible Power and Cooling Distribution Unit replacement/ installation and a Site Lead/Project Manager to provide the following critical tasks to support to the WYANG per the PWS. � 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid. � 5.3.4 Demo existing piping � 5.3.5 Run new Pex piping to the in-row coolers. � 5.3.6 Furnish & install new 350A shut Trip Breaker with nema-1 Enclosure. Tie existing EPO into new Shunt Trip breaker. � 5.3.7 Existing 3� Feeder conduit & wire fed from MDP will be shutdown & locked out. Intercept existing Feeder to line side of new 350A Shunt Trip Breaker/Enclosure. Install Load side Feeder conduit & wire from new Shunt Trip Breaker to new UPS. � 5.3.8 Demo existing UPS, remove from Data Center, Dispose/recycle old UPS. � 5.3.9 Install Power Modules and Battery Cabinets � 5.3.10 Assume the existing structural integrity of raised floor is sufficient to move old UPS across floor & new UPS installed at old UPS location. All raised floor modifications by others. SITE VISIT: 10 JUNE 2026 AT 1300 MDT at 217 Dell Range Blvd, Cheyenne, WY 82009 - IF NO REQUEST FOR SITE VISIT ARE RECIEVED BY 08 JUNE 2026 AT 1200 MDT, IT WILL BE CANCELED. QUESTIONS DUE: 12 JUNE 2026 AT 1000 MDT