USFaster Tender
OpenCombined Synopsis/Solicitation

Carbon Fiber Cutting System

ORNL UT-BATTELLE LLC-DOE CONTRACTORENERGY, DEPARTMENT OF / ENERGY, DEPARTMENT OF / ORNL UT-BATTELLE LLC-DOE CONTRACTOR

Posted
May 22, 2026
Response deadline
Jun 2, 2026, 4:00 PM EDT
Due tomorrow
Value
Category
Goods & Supplies — Other
NAICS
333248
PSC / Class
2520
Set-aside
Place of performance
Tennessee
Solicitation #
PR471273
Archive date
Jun 2, 2026

Search tags

Description

ORNL is requesting a quote for the same or domestic equivalent of a Carbon Fiber Cutting System with the below specifications and technical capabilities. FAR 52.211-6, Brand Name or Equal applies. Key custom features include: Custom-built to ORNL�s roll/core specs o Unwind (mother roll) core ID 10�, cardboard core, ~12� wide roll. o Rewind (product) core ID 3� on a custom aluminum spool, ~11� wide, with notched/keyway ends (machine must accept/drive/locate this spool correctly). Carbon-fiber-appropriate cutting system o Use tungsten carbide cutting edges or other edge suitable for durability when cutting carbon fiber (instead of the �Japanese tool steel� blades referenced generically for other applications). o Vendor to maintain extra blade sets in stock for the custom machine (supportability expectation). Waste handling different from the standard model behavior o Standard behavior described: scraped trim on each side is cut and re-rolled along with the good cuts. o ORNL requirement/customization: waste cannot be wound together with the good product; needs separate waste management, with the proposed custom approach being rewinding waste into separate waste roll(s) (one/both sides) or otherwise directing it separately. Adjustable slit width via knife/spacer arrangement o Width adjustment called out as required; Vendor proposed spacers between knives as the adjustment mechanism. Independent drives/controls o Cutter speed and winding speed independently controlled, each with its own motor, and adjustable feed rate (called out explicitly as a capability of the proposed configuration).