USFaster Tender
ClosedSolicitation

W912BV26QA032

W076 ENDIST TULSADEPT OF DEFENSE / DEPT OF THE ARMY / W076 ENDIST TULSA

Posted
Feb 10, 2026
Response deadline
Mar 11, 2026, 4:00 AM EDT
Closed
Value
Category
Services — Other
NAICS
562119
PSC / Class
S208
Set-aside
Place of performance
Solicitation #
W912BV26QA032
Archive date
Feb 10, 2027

Search tags

Description

The contractor shall provide labor, equipment, and materials needed to efficiently complete all work in accordance with this scope of work, the attached drawings, the specifications, and all other contract documents and requirements. The result will be an upstream embankment free of debris at the John Redmond Dam Embankment. The earth-fill dam embankments are protected by rip rap on the upstream face. Debris (trees, limbs, trash, etc.) accumulates on the upstream side of the dam embankments during periods of high water. The removal of this debris is to be completed without the movement/impacts/displacement of the protective rip rap through the proposed process. CLIN 0001 Bid Item J-1: John Redmond Reservoir Upstream Dam Embankment Debris Removal and Disposal. Located approximately 5 miles Northwest of Burlington, Kansas, off U.S. Highway 75, in Coffey County. (Reference Map for Area of Performance). CLIN 0002 Bid Item J-2: John Redmond Reservoir Upstream Dam Embankment Debris Removal and Disposal. Located approximately 5 miles Northwest of Burlington, Kansas, off U.S. Highway 75, in Coffey County. (Reference Map for Area of Performance).