USFaster Tender
ClosedSmall BusinessCombined Synopsis/Solicitation

Scaffolding Rental and Erection at Kentucky Lock and Dam

W072 ENDIST PITTSBURGHDEPT OF DEFENSE / DEPT OF THE ARMY / W072 ENDIST PITTSBURGH

Posted
Sep 4, 2025
Response deadline
Sep 11, 2025, 11:00 AM EDT
Closed
Value
Category
Commercial Equipment Rental
NAICS
532490
PSC / Class
5450
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Place of performance
Solicitation #
W9123725QA062
Archive date
Sep 4, 2026

Search tags

Description

The Contractor shall erect 40 feet of stair scaffolding from the bottom of the dewatered lock chamber floor to the top of the temporary dam. The approximate location for this scaffolding will be 10 to 15 feet upstream of the lower miter gates on the land wall side of the chamber. The scaffolding can be anchored to the vertical concrete lock wall from the bottom of the chamber floor to the top of the 40-foot scaffolding. The Contractor shall provide 5 each 1-inch-thick steel plates measuring 5-ft x 10-ft for the scaffolding leg support on the bottom of the lock chamber for stability. This work shall be completed on October 27-28, 2025, after the lock chamber is dewatered. The Contractor shall disassemble the scaffolding between November 17-18, 2025. The Government will supply cranes, crane operators and riggers to move scaffolding components, equipment and personnel from the parking lot to the lock chamber floor during erection and back out of the chamber during disassembly. **NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?.