USFaster Tender
ClosedSmall BusinessCombined Synopsis/Solicitation

W91237-25-Q-A068 UPPER OHIO TAINTER GATE GEARBOX

W072 ENDIST HUNTINGTONDEPT OF DEFENSE / DEPT OF THE ARMY / W072 ENDIST HUNTINGTON

Posted
Sep 5, 2025
Response deadline
Sep 17, 2025, 11:00 AM EDT
Closed
Value
Category
Goods & Supplies — Other
NAICS
333612
PSC / Class
5680
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Place of performance
Solicitation #
W9123725QA068
Archive date
Sep 5, 2026

Search tags

Description

This is an Army Corps of Engineers, Huntington District, requirement to fabricate, test, and deliver one speed reducer and appurtenances to Willow Island Locks and Dam with an option to provide one speed reducer and appurtenances as described below. Gearbox delivery must be within 26 weeks after notice to proceed. New couplings (both halves) shall be supplied for each shaft. Half of each coupling to be installed by the Contractor on each shaft. All internal and external bearings are to be replaced. New External Pinion Gear to be supplied and installed on the new gearbox. The gearbox must be installed with a way for the gearbox to breathe. A site visit is recommended by the Contractor to ensure all components are compatible with existing features. Both the base and the option have the same requirements as detailed in these specifications. If the option is exercised, the Contractor shall provide a speed reducer that is opposite-hand orientation of the base as shown on the drawings. All other characteristics to remain the same as the base gearbox.