ClosedCombined Synopsis/Solicitation
Electric Arc Furnace removal ,acquisition and installation
W6QK ACC-RIDEPT OF DEFENSE / DEPT OF THE ARMY / W6QK ACC-RI
- Posted
- Apr 29, 2026
- Response deadline
- Jun 1, 2026, 1:00 PM EDT
- Closed
- Value
- —
- Category
- Goods & Supplies — Other
- NAICS
- 333248
- PSC / Class
- 4430
- Set-aside
- —
- Place of performance
- Rock Island, Illinois
- Solicitation #
- W519TC26R028
- Archive date
- Jun 16, 2026
Search tags
Description
U.S. Army Contracting Command - Rock Island (ACC-RI) has a requirement to provide the following: Detailed design engineering, specification development, project management, equipment installation, concrete work, construction services, equipment commissioning, training and the procurement of (1) 5-Ton Electric Arc furnace (with the option for a second) and necessary supporting equipment such as bag house dust collection system, compressed Air and Argon storage tanks, (1) 5-ton AOD system, plus the demolition and removal of the existing 5-Ton Arc furnace. Please review attachments for complete requirement. Note a site visit for this requirement is scheduled for 8 May 2026 at 8am.