ArchivedSmall BusinessCombined Synopsis/Solicitation
Construction of the Pavement Performance Test Facility Laboratory at the Turner-Fairbank Highway Research Center
693JJ3 ACQUISITION AND GRANTS MGTTRANSPORTATION, DEPARTMENT OF / FEDERAL HIGHWAY ADMINISTRATION / 693JJ3 ACQUISITION AND GRANTS MGT
- Posted
- Aug 22, 2019
- Response deadline
- Sep 2, 2019, 10:00 AM EDT
- Closed
- Value
- —
- Category
- Prefabricated Metal Buildings
- NAICS
- 332311
- PSC / Class
- 54
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Place of performance
- MCLEAN, Virginia
- Solicitation #
- 693JJ319Q000094
- Archive date
- Sep 17, 2019
Search tags
Description
Amendment: Update quotation due date and add question cutoff date. The purpose of the contract is construct a pre-engineered steel building at the Tuner-Fairbank Highway Research Center in McLean, Virginia. The steel building will be between 26 ft wide,70 ft long, with a wall height between 14-16 ft and a roof pitch between 4:12 and 2:12. The building will be insulated, with 4-exterior doors, 10-windows, and 2-roll-up garage doors,12x12 ft. and 9x 8 ft. An inside area of the building will be framed with finishing to make an office, bathroom, and small electronics shop with HVAC for the partitioned areas. See Attachment for detail requirement.