USFaster Tender
OpenSolicitation

Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY)

W071 ENDIST OMAHADEPT OF DEFENSE / DEPT OF THE ARMY / W071 ENDIST OMAHA

Posted
May 18, 2026
Response deadline
Jun 17, 2026, 3:00 PM EDT
Due in 16 days
Value
Category
Power & Communication Lines
NAICS
237130
PSC / Class
Y1NZ
Set-aside
Place of performance
Solicitation #
W9128F26RA017
Archive date
Mar 31, 2027

Search tags

Description

$1.7B UNR TWO-PHASE DB/DBB MATOC FOR CONSTRUCTION OF THE GBSD UTLITY CORRIDOR AT F. E. WARREN AFB, WY. Reference Section 00 00 00 Procurement and Contracting Requirements for additional not included on the SF 1442 description. The Phase Two Seed Project Specifications and Drawings contain Controlled Unclassified Information and instructions to request access to these documents are located in Section 00 00 00. Vendors must be registered in both System for Award Management and Procurement Integrity Enterprise Environment to obtain approval for access to all CUI documents and submit proposals. Reference Solicitation Section 00 22 10 for registration instructions to access these systems. Reference the Solicitation for compliance with NIST and Cybersecurity Maturity Model Certification requirements as it pertains to this acquisition.