USFaster Tender
ClosedPresolicitation

LOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)

W07V ENDIST ST LOUISDEPT OF DEFENSE / DEPT OF THE ARMY / W07V ENDIST ST LOUIS

Posted
Apr 14, 2026
Response deadline
Apr 24, 2026, 12:00 PM EDT
Closed
Value
Category
Heavy & Civil Engineering
NAICS
237990
PSC / Class
Y1PZ
Set-aside
Place of performance
Solicitation #
W912P926RA001
Archive date
Dec 31, 2026

Search tags

Description

The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work. The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall. For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed. ---- Presolicitation Synopsis Update 0001 - update the POP information.