USFaster Tender
ClosedSmall BusinessSolicitation

Monroe Harbor Advanced Maintenance Dredging

W072 ENDIST DETROITDEPT OF DEFENSE / DEPT OF THE ARMY / W072 ENDIST DETROIT

Posted
Dec 17, 2025
Response deadline
Jan 21, 2026, 2:00 PM EST
Closed
Value
Category
Heavy & Civil Engineering
NAICS
237990
PSC / Class
Y1KF
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Place of performance
Solicitation #
W911XK26BA013
Archive date
Dec 17, 2026

Search tags

Description

Monroe Harbor Advanced Maintenance Dredging - The project requirements include: Mobilize dredge to Monroe Harbor. Monroe Harbor will be mechanically dredged due to the character of materials (boulders, rocks, and more clay-like material) within the harbor. Dredged material placement method is unrestricted. The harbor will be dredged to a depth of 23-ft below Low Water Datum (LWD) plus 1-ft overdepth or point of refusal, whichever is less, within the main channel for STA 60+00 to 76+00, 0+00 to 20+00 river and 0+00 to 20+00 lake. From STA 15+75 to 4+00, a section near the wall will be dredged to 20 ft below LWD plus 1-ft overdepth or point of refusal, whichever is less. The turning basin will be dredged to a depth of 20-ft below LWD plus 1-ft overdepth or point of refusal, whichever is less, for STA 64+72 to 79+00. Placement of dredged material will be in Cell 3 at Pointe Mouillee Confined Disposal Facility (CDF). No discharge is allowed at Pointe Mouillee CDF. Demobilize when dredge work is complete.