ClosedSmall BusinessSolicitation
FY25 Ludington and Pentwater Maintenance Dredging
W072 ENDIST DETROITDEPT OF DEFENSE / DEPT OF THE ARMY / W072 ENDIST DETROIT
- Posted
- Mar 23, 2026
- Response deadline
- Mar 20, 2026, 2:00 PM EDT
- Closed
- Value
- —
- Category
- Heavy & Civil Engineering
- NAICS
- 237990
- PSC / Class
- Y1KF
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Place of performance
- —
- Solicitation #
- W911XK26BA011
- Archive date
- Mar 11, 2027
Search tags
Description
***Posting of the bid abstract.***Amendment 0001 is issued to provide revised Plan Sheets CN101 and CN102. Reference amendment documents for full details.***FY25 Ludington and Pentwater Maintenance Dredging. Mobilize to Ludington Harbor and Pentwater Harbor and dredge between the upstream and downstream limits as shown on the contract drawings. Place dredged material at respective placement sites pertaining to each harbor, as outlined in the contract drawings and specifications. If applicable option(s) are exercised, re-mobilize to Pentwater Harbor in 2027 and dredge between the upstream and downstream limits as shown on the contract drawings. Upon completion of the work, clean-up and demobilize from the harbors. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on ?View FFP Contract Changes Playbook Here?.