USFaster Tender
ClosedSolicitation

Fort Pierce Beach Renourishment, St. Lucie County, FL

W074 ENDIST JACKSNVLLEDEPT OF DEFENSE / DEPT OF THE ARMY / W074 ENDIST JACKSNVLLE

Posted
Aug 12, 2025
Response deadline
Aug 19, 2025, 1:00 PM EDT
Closed
Value
Category
Heavy & Civil Engineering
NAICS
237990
PSC / Class
Z2KF
Set-aside
Place of performance
Solicitation #
W912EP25BA017
Archive date
Aug 12, 2026

Search tags

Description

Project work includes construction of a beach berm along approximately 7,000 feet of shoreline immediately south of Fort Pierce Inlet between Florida Department of Environmental Protection (FDEP) Range Monuments R-34 and T-41. Beach compatible sand for the project will be dredged from Capron Shoal, located approximately four miles southeast of the project site in state waters. Due to the extensive hardbottom areas located offshore of the fill area, offshore pipeline access to the beach site is prohibited.Offloading the beach fill will be done inside the South Jetty of Fort Pierce Inlet, as shown on the plans. Astaging area and beach access to the beach placement area are located at the end of Seaway Drive and near the south jetty offloading area. Work also includes but is not limited to environmental species monitoring, sea turtle trawling (hopper dredges only), turbidity monitoring, beach tilling, beach fill quality control, screening, MEC construction support, and vibration control and monitoring. The project work is subdivided into a base and one option as indicated on the drawings.