OpenSmall BusinessCombined Synopsis/Solicitation
Mark Twain NF Beaver Lake Dam Rehabilitation
USDA-FS, STEWARDSHIP CONTRACTING BRANCHAGRICULTURE, DEPARTMENT OF / FOREST SERVICE / USDA-FS, STEWARDSHIP CONTRACTING BRANCH
AI quick read
USDA-FS seeks a total small‑business set‑aside contractor to rehabilitate the Mark Twain NF Beaver Lake Dam in Missouri, including water level drawdown, clearing, excavation, conduit removal, and spillway riprap repair.
- Agency: USDA Forest Service, Stewardship Contracting Branch
- Set‑aside: Total Small Business (FAR 19.5)
- NAICS: 237310 – Highway/Road/Bridge construction
- Scope: draw down water, clear/grub, excavate and remove overflow conduit, repair spillway erosion with riprap
- Response deadline: June 30, 2026
Good fit for: Ideal for small firms with civil construction experience, especially in dam/overflow conduit work, excavation, and riprap installation.
AI-generated from the SAM.gov listing — verify all details on the official source before bidding.
- Posted
- Jun 1, 2026
- Response deadline
- Jun 30, 2026, 12:00 PM EDT
- Due in 23 days
- Value
- —
- Category
- Highway / Road / Bridge
- NAICS
- 237310
- PSC / Class
- Z1LB
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Place of performance
- Missouri
- Solicitation #
- 12363N26Q4161
- Archive date
- Jul 15, 2026
Search tags
Market context
- Open in NAICS 237310
- 209
- 2 in Missouri
- Typical award (NAICS)
- $3,030,480
- median of 69 awards
- Recent winners
- —
Description
MAKING IMPROVEMENTS AS NECESSARY TO DRAW DOWN WATER LEVELS, CLEAR AND GRUB, EXCAVATE AND REMOVE EXISTING OVERFLOW CONDUIT AND APPURTENANCES AND REPAIRING SPILLWAY EROSION WITH RIPRAP.