ClosedSolicitation
P400--436-24-105 Miles City VA Campus Demolition
NETWORK CONTRACT OFFICE 19 (36C259)VETERANS AFFAIRS, DEPARTMENT OF / VETERANS AFFAIRS, DEPARTMENT OF / NETWORK CONTRACT OFFICE 19 (36C259)
- Posted
- May 27, 2026
- Response deadline
- May 29, 2026, 4:00 PM EDT
- Closed
- Value
- —
- Category
- Site Preparation
- NAICS
- 238910
- PSC / Class
- P400
- Set-aside
- —
- Place of performance
- —
- Solicitation #
- 36C25926R0047
- Archive date
- Jun 28, 2026
Search tags
Awarded to
null
Description
36C25926R0047 0003 The purpose of this amendment is to provide a clarification for question 55b regarding footings/foundations/piers/pilings. Question 55b is changed from: The Statement of Work indicates that foundations are to be demolished to one foot below grade except for piles. Please confirm: Do any buildings contain driven piles or deep foundations? Both, Please reference as-builts.� Bldg. 1 has deep foundations and pile footings.� Is pile removal explicitly excluded from the scope of work? Yes, unless they are one foot above existing basement soil elevations. If pile removal is excluded, please identify known locations.� Refer to the as-built drawings. To: The Statement of Work indicates that foundations are to be demolished to one foot below grade except for piles. Please confirm: Do any buildings contain driven piles or deep foundations? Both, Please reference as-builts.� Bldg. 1 has deep foundations and pile footings.� Is pile removal explicitly excluded from the scope of work? Yes, unless they are above one foot below grade. If above one foot below grade piles shall be demolished to be one foot below grade. If pile removal is excluded, please identify known locations.� Refer to the as-built drawings.