USFaster Tender
OpenSmall BusinessSolicitation

Weeks Brook Bridge Railing Repair, Franklin Falls Dam, Sanbornton, NH

W2SD ENDIST NEW ENGLANDDEPT OF DEFENSE / DEPT OF THE ARMY / W2SD ENDIST NEW ENGLAND

Posted
May 26, 2026
Response deadline
Jun 3, 2026, 5:00 PM EDT
Due in 2 days
Value
Category
Highway / Road / Bridge
NAICS
237310
PSC / Class
Y1LB
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Place of performance
Solicitation #
W912WJ26QA100
Archive date
Jun 18, 2026

Search tags

Description

THE WORK CONSISTS OF: The Contractor shall furnish all labor, materials, and equipment for the complete removal of the existing bridge railing and posts at Weeks Brook Bridge. The work includes the installation of a new railing system, anchored to the superstructure as detailed in the contract drawings. The new railing posts and guardrails shall conform to the standard details and specifications of the New Hampshire Department of Transportation (NHDOT). However, the connections of these components to the existing bridge superstructure shall be executed in accordance with the project-specific designs. The magnitude of construction is between $25,000 and $100,000. For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil) This procurement is set-aside for small business vendors. The applicable NAICS code is 237310 with a Small Business Size Standard of $45 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.