Faster Tender
OpenSDVOSBCombined Synopsis/Solicitation

STERIRACK (BRAND NAME/EQUAL) SHELVING UPGRADE

241-NETWORK CONTRACT OFFICE 01 (36C241)VETERANS AFFAIRS, DEPARTMENT OF / VETERANS AFFAIRS, DEPARTMENT OF / 241-NETWORK CONTRACT OFFICE 01 (36C241)

AI quick read

Get a plain-English summary, the key facts a bidder needs, and who it's a fit for.

Posted
Jun 5, 2026
Response deadline
Jun 15, 2026, 10:00 AM EDT
Due in 8 days
Value
Category
Construction — Other
NAICS
238390
PSC / Class
J072
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Place of performance
West Roxbury, Massachusetts
Solicitation #
36C24126Q0554
Archive date
Jun 30, 2026

Search tags

Market context

Open in NAICS 238390
7
1 in Massachusetts
Typical award (NAICS)
$63,500
median of 3 awards
Recent winners

Description

The VA Boston Healthcare System (VABHCS) has a requirement for a contractor to provide SPS Sterirack Shelving Upgrade (Brand Name or Equal) Tray & Soft Goods Storage Area timely, effective, and high-quality mission critical, non-clinical services to the West Roxbury (WX) facility located at 1400 VFW Parkway, West Roxbury, MA 02132. The main objective of this contract is to ensure the operational reliability of the facility, effectively and efficiently respond to and mitigate any infrastructure-related condition, and to maintain a safe and healthy worksite for staff, patients, volunteers, visitors, contractors, and the general public. Maintenance intervals may be determined by National Fire Protection Association (NFPA) standards, manufacturer recommendations, metering, predictive maintenance sampling, VA policies, federal regulations and statutes, adopted codes, or other strategies. requirements from The Joint Commission (TJC), Veterans Health Administration (VHA), and other regulatory bodies. Site Visit: A site visit will be held on June 10th at 10:00am EST. The location of the site visit is West Roxbury VA Medical Center � 1400 VFW Parkway, West Roxbury, MA 02132 in Building 2, Basement, Room AB03. The purpose of the site visit will give vendors the opportunity to obtain specific measurements which is required for the configuration. The estimated period of performance consists of a one year base period beginning June 30, 2026 to June 29, 2027.