USFaster Tender
ArchivedSmall BusinessSolicitation

Modernize and Upgrade New Pumphouse and Substation (Long Beach VA Campus

W075 ENDIST LOS ANGELESDEPT OF DEFENSE / DEPT OF THE ARMY / W075 ENDIST LOS ANGELES

Posted
Jun 25, 2025
Response deadline
Jul 21, 2025, 4:00 PM EDT
Closed
Value
Category
Commercial Building
NAICS
236220
PSC / Class
Y1NE
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Place of performance
Solicitation #
W912PL25BA008
Archive date
Jul 21, 2025

Search tags

Description

PIEE Amendment 0001 is issued to transmit the SF-30 (7 pages) of the RFP W912PL25BA008, this amendment does not extend the proposal date. This is to provide site visit information and update conditions of U. S. Army Corps of Engineers Safety and Health Requirements.The project will construct a new combined pumphouse and substation followed by the demolition of the current building 125 pumphouse and substation 12A/see below. The existing pumphouse will be operational in its current location during construction. Temporary power will be provided to the Fisher House on-campus hotel during construction. The construction will be performed in phases to allow continuous operation of the existing pumphouse. This requirement will include, but will not be limited to, preparation and/or performance for, submittals, field investigations, site visits, meetings and providing construction meeting minutes to the COR, staff interviews, phasing/scheduling, utility shutdowns, infection control measures and other related information and services. Based on history of VA Long Beach Campus, there is a likelihood of asbestos within the existing pumphouse.