USFaster Tender
ClosedSolicitation

CONSTRUCTION OF DORMITORY AT JOINT BASE LANGLEY-EUSTIS, HAMPTON, VA

W2SD ENDIST NORFOLKDEPT OF DEFENSE / DEPT OF THE ARMY / W2SD ENDIST NORFOLK

Posted
Mar 30, 2026
Response deadline
May 14, 2026, 4:00 PM EDT
Closed
Value
Category
Commercial Building
NAICS
236220
PSC / Class
Y1FC
Set-aside
Place of performance
Solicitation #
W9123626RA006
Archive date
Mar 30, 2027

Search tags

Description

Construct a dormitory with all necessary spaces to house 144 enlisted personnel at Joint Base Langley-Eustis. The construction includes 12 accessible rooms, compacted fill above the 100-year flood plain, reinforced concrete foundations and floor slabs, structural steel frame at building core and load bearing metal studs at building wings. The exterior walls are brick facade, precast concrete base, and limited metal panel walls and glass storefront in building core and entrances. The roof system is a structural steel frame with trusses at building wings and open web joists at building core and a standing seam metal roofing on building wings and low slope single-ply membrane roofing system on building central core. The project includes long-run outside plant communications and manhole/duct system pathway, connections to existing installation utility infrastructure, providing capacity to support facility loads. The project will include all necessary utilities, site preparation, pavements, site improvements, communication, remediation of petroleum contaminated soil within the footprint, security enhancements, area lighting, removal of utilities, and all necessary supporting work for a complete and usable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable codes and design guides. Facility will be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria 1-200-01 General Building Requirements. This project will comply with Department of Defense anti-terrorism/force protection requirements per Unified Facilities Criteria 4-010-01. Please see the attachments for additional information. This project will be subject to the Project Labor Agreement requirements.