ArchivedSmall BusinessSolicitation
Modernize and Upgrade New Pumphouse and Substation (Long Beach VA Campus
W075 ENDIST LOS ANGELESDEPT OF DEFENSE / DEPT OF THE ARMY / W075 ENDIST LOS ANGELES
- Posted
- Jun 18, 2025
- Response deadline
- Jul 21, 2025, 4:00 PM EDT
- Closed
- Value
- —
- Category
- Commercial Building
- NAICS
- 236220
- PSC / Class
- Y1NE
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Place of performance
- —
- Solicitation #
- W912PL25BA008
- Archive date
- Jul 21, 2025
Search tags
Description
The project will construct a new combined pumphouse and substation followed by the demolition of the current building 125 pumphouse and substation 12A/see below. The existing pumphouse will be operational in its current location during construction. Temporary power will be provided to the Fisher House on-campus hotel during construction. The construction will be performed in phases to allow continuous operation of the existing pumphouse. This requirement will include, but will not be limited to, preparation and/or performance for, submittals, field investigations, site visits, meetings and providing construction meeting minutes to the COR, staff interviews, phasing/scheduling, utility shutdowns, infection control measures and other related information and services. Based on history of VA Long Beach Campus, there is a likelihood of asbestos within the existing pumphouse