ArchivedSolicitation
REPAIR INTERIOR CEILING, B224
FA5270 18 CONS PKDEPT OF DEFENSE / DEPT OF THE AIR FORCE / FA5270 18 CONS PK
- Posted
- May 30, 2025
- Response deadline
- Jun 30, 2025, 1:00 AM EDT
- Closed
- Value
- —
- Category
- Commercial Building
- NAICS
- 236220
- PSC / Class
- Z2AZ
- Set-aside
- —
- Place of performance
- —
- Solicitation #
- FA527025R0009
- Archive date
- May 30, 2026
Search tags
Description
PROJECT REQUIRMENTA) This project shall accomplish a design-build repair the true ceiling of B224. Work includes full Asbestos-Containing Material (ACM) abatement of the ceiling paint and repair spalls and cracks. Include any site preparation work such as temporary removal of the suspended ceiling, lighting system, alarm, electrical wiring and conduit, and ceiling hung air-condition unit. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02, High Performance and Sustainable Building Requirements.B) The scope of work may require the sampling, removal/abatement, and disposal of ACM, LBP, or other hazardous building materials.C) The Contractor shall determine the best technical design solution in conformance with current regulations. The design and construction work shall comply with US federal, Department of Defense, Air Force, and 18 Wing criteria, as well as applicable Japan regulatory requirements not specifically stated elsewhere in this project statement of work to provide a complete and usable facility upon completion.D) The detailed Scope of Work is described here-in below and the attached supporting documents.E) Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 130 (Work Clearance). The Contractor shall coordinate on-site safety requirements through 718th Civil Engineer Squadron (718 CES)