Faster Tender
OpenSmall BusinessCombined Synopsis/Solicitation

Construction - NUWCDIVNPT B68 Rm 136 Renovation Project

NUWC DIV NEWPORTDEPT OF DEFENSE / DEPT OF THE NAVY / NUWC DIV NEWPORT

AI quick read

Get a plain-English summary, the key facts a bidder needs, and who it's a fit for.

Posted
Jun 2, 2026
Response deadline
Jun 12, 2026, 2:00 PM EDT
Due in 5 days
Value
Category
Commercial Building
NAICS
236220
PSC / Class
Z1AZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Place of performance
Newport, Rhode Island
Solicitation #
N6660426Q0291
Archive date
Jun 27, 2026

Search tags

Market context

Open in NAICS 236220
1,032
5 in Rhode Island
Typical award (NAICS)
$10,143,364
median of 250 awards
Recent winners

Description

PLEASE READ THIS ENTIRE NOTICE CAREFULLY AS IT CONSTITUES THE ONLY NOTICE THAT WILL BE ISSUED. Amendment 0001 6/2/2026: The purpose of this Amendment is to: Replace Attachment #3 with revised version dated 18 May 2026. Answer RFI 001 as seen below. RFI 001 1. For the flex duct penetration through the exterior wall, will this require a full, top-to-bottom piece of the metal siding to be replaced, or will a partial repair be acceptable? A1. Partial repair is approved. The Navy is seeking to eliminate any drafts once the duct work is removed. Penetration in wall shall be completely sealed. 2. Please provide pictures of the windows requiring new glazing. Please include interior and exterior photos and possibly an exterior photo of the entire wall, showing upper and lower windows. For interior, please ensure the hardware is captured. A2. No new glazing is required. 3. During the site visit, it was observed that a leak capture system was in place. Please confirm if this roof leak has been repaired, or if the leak is still active. A3. Leak is no longer active. No repairs to roof are required. 4. The solicitation documents included a Hazmat study of the building. Within this study, it indicates that lead paint is found on the white paint on drywall walls, white paint on the wood window sills, and the pale yellow paint on the concrete exterior wall under the drywall. For this project scope and limit of disturbance, there are no white drywall walls, no window sills, and the concrete exterior wall under the drywall will not be exposed. Is lead paint remediation required under the scope of work for only the Rm 136 renovations? A4. See Revised Specifications (REV 1). 5. There is no spec for the glass for the windows. Will a spec section for the glass be made available? A5. See Revised Specifications (REV 1). 6. Does the electrical subcontractor performing the electrical scope of work need to hold a Rhode Island electrical license, or will an out-of-state electrical license suffice for this project? A6. Out-of-State is Allowed. 7. Are electric man-lifts permitted for use on this project? A7. Yes, however, it might be difficult getting a man lift in the area of work. All other solicitation terms and conditions remain unchanged. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Please see N6660426Q0291 and all attachments for complete requirement details. Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active registration in SAM.GOV. Interested parties should request access to drawings, specifications, and photos within the attachments section of this solicitation. NUWCDIVNPT will review and approved requests within SAM.GOV. A controlled attachment requires special handling due to the information it contains. You must have a data entry or administrator role within the Contract Opportunities domain for an entity in SAM.gov in order to request access. If you do not have a proper role, you can request it from an existing entity administrator or have the existing administrator assign roles directly to you. If your entity does not have a direct employee, officer or board member appointed as the Entity Administrator, you will need to complete an Entity Administrator Appointment Letter. You must request access to the attachment by clicking on its title and providing the reason you need access. You will not receive immediate access to view the document. The contracting officer will review your request to grant or reject your access. Your entity is responsible for managing the documents in accordance with prescribed directives. https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=733b9d881bbc71506397ec21f54bcb0a