USFaster Tender
ClosedSolicitation

Fire Alarm System Replacement, Mountain Home AFB

FA4897 366 CONS PKPDEPT OF DEFENSE / DEPT OF THE AIR FORCE / FA4897 366 CONS PKP

Posted
Oct 30, 2025
Response deadline
Dec 1, 2025, 5:00 PM EST
Closed
Value
Category
Commercial Building
NAICS
236220
PSC / Class
J063
Set-aside
Place of performance
Mountain Home AFB, Idaho
Solicitation #
FA489725R0008
Archive date
Dec 1, 2026

Search tags

Description

Amendment: RFIs: RFI responses uploaded as an attachment. Site Visit: All interested parties will need to meet at the visitor's center at 1330 local (MST) to acquire day passes and we will go to the site afterwards. The visitor's center is located just north of the main gate, on the west side of the highway. If you stay to the right as you approach the base, you can turn into the visitor center's parking lot about 100ft before the manned gate. Attempting to enter the base without a pass will result in a lengthy delay. We will be leaving the visitor's center at 1400 local time (MST). Idaho Contractor Registration: Removed this requirement. Construction start date: No earlier than 1 June, 2026 Contact info: The phone number for SSgt Smith was input incorrectly. His phone contact number is 208-828-0743 Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance. Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system. It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out. Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc. See attachments below for all relevant documents. For the proposal, all "if applicable" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable. A site visit for any interested parties will be held on November 3rd, 2025 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after. Per the evaluation factors, Questions must be submitted no later than 3:00 PM local (Mountain), Nov 17, 2025. Proposals must be submitted no later than 3:00 PM local (Mountain), Dec 1, 2025. Questions shall be directed to both POCs.