ClosedSDVOSBSolicitation
Construct EHRM Infrastructure Upgrades - Philadelphia, PA
PCAC (36C776)VETERANS AFFAIRS, DEPARTMENT OF / VETERANS AFFAIRS, DEPARTMENT OF / PCAC (36C776)
This solicitation has closed (deadline was Jun 3, 2026, 4:00 PM EDT). Browse related open opportunities →
AI quick read
Get a plain-English summary, the key facts a bidder needs, and who it's a fit for.
- Posted
- May 20, 2026
- Response deadline
- Jun 3, 2026, 4:00 PM EDT
- Closed
- Value
- —
- Category
- Commercial Building
- NAICS
- 236220
- PSC / Class
- Y1DA
- Set-aside
- Service-Disabled Veteran-Owned Small Business Set Aside
- Place of performance
- Pennsylvania
- Solicitation #
- 36C77626R0063_1
- Archive date
- Jun 18, 2026
Search tags
Market context
- Open in NAICS 236220
- 1,026
- 12 in Pennsylvania
- Typical award (NAICS)
- $10,143,364
- median of 250 awards
- Recent winners
- 5
Recent incumbents in this NAICS · Pennsylvania
- ARCTIC PEAK LLC Herndon VA 20171 USA$200,000,000
- RIO VISTA MANAGEMENT LLC West Jordan UT 84088 USA$200,000,000
- ARK CONSTRUCTION MANAGEMENT LLC Mechanicsburg PA 17050 USA$200,000,000
- BELT BUILT CONTRACTING, LLC Crofton MD 21114 USA$200,000,000
- BINARY EXCHANGE TECHNOLOGIES LLC Germantown MD 20874 USA$200,000,000
Description
PROJECT DESCRIPTION The awarded Contractor shall complete all construction work detailed by the 100% bid design drawings, specifications, and project manual included in this solicitation, prepared by the A/E Health Facilities Solutions. Campus buildings impacted by the upgrades include Buildings 1, 2, 3, 21, and 30. Upgrades in these buildings shall include existing rooms and telecommunication closets and include relocation, reconfiguration, expansion, and renovation involving new walls, doors and finishes, etc. throughout each space. Construction work shall also comply with VA �Infrastructure Standard for Telecommunications Spaces (ISTS) V4.0, June 1, 2023. Bid work shall include General Construction (and associated trades), Structural, Mechanical and HVAC, Plumbing and Fire Protection, Electric, and Information Technology, Civil. The VA Physical Security Design and Resiliency Manual (PDRSM) requirements shall be incorporated into the construction of the project. The project work areas will be occupied by staff or patients during construction. Work shall not be allowed between the hours of 5am � 5pm ET. All materials and equipment must be moved to the work areas after staff/patients have vacated after 5pm each day. All materials and equipment must be removed from the work areas, dust and debris cleared, and work completed or returned to typical conditions prior to 5am each day. Project phasing shall be required as not all work areas will be available for construction concurrently. In summation, available work hours are from 5pm � 5am ET. Site visit prior to bid shall be required to ensure contractor has an understanding of existing conditions. 4/16/2026: Amendment 0001 Posted 4/29/2026: Amendment 0002 Posted 5/20/2026: Amendment 0003 Posted