USFaster Tender
ArchivedSolicitation

LXEZ221048 Repair Restrooms Contracting Office B95

FA5270 18 CONS PKDEPT OF DEFENSE / DEPT OF THE AIR FORCE / FA5270 18 CONS PK

Posted
May 7, 2025
Response deadline
May 30, 2025, 1:30 AM EDT
Closed
Value
Category
Commercial Building
NAICS
236220
PSC / Class
Z2AA
Set-aside
Place of performance
Solicitation #
FA527025R0007
Archive date
May 7, 2026

Search tags

Awarded to

null

Description

Amendment 0001 to solicitation FA527025R0007 has been posted in PIEE extending the due date for proposals to 30 May 2025. A subsequent site visit will conducted on 13 May so vendors can view site conditions of the project. After the site visit, RFI (request for information) will be due 16 May. Provide all labor, materials, and equipment necessary to repair four restrooms in Building 95 to provide a reliable and efficient plumbing system for 18th Contracting Squadron (18 CONS) Office. Architectural repairs include replacement of interior finishes including ceiling, wall and flooring, replacement of doors, windows, bathroom vanities, specialties such as partitions, and bathroom and janitorial accessories. Reconfigure the existing interior spaces on the first floor to provide minimum clearances, turning spaces, fixture spacing, and stall dimensions to accommodate personnel in wheelchairs. Mechanical repairs include replacement of bathroom exhaust fans and controls, replacement of plumbing fixtures, water heater, entire domestic water runs from fixtures to mains, domestic water risers, vent piping, and sanitary sewer piping from fixtures to mains. Electrical repairs include replacement of lighting fixtures, lighting controls, receptacles, and miscellaneous power for mechanical equipment. Provide temporary bathroom facility and utility connections required for construction. Suspect hazardous materials (hazmat) such as Asbestos Containing Material (ACM) and Lead-Based Paint (LBP) were tested in the work areas. Project includes abatement on positive building materials that will be disturbed by the repairs of the project. B) The scope includes the abatement/removal of any ACM, LBP, or any hazardous materials.