Faster Tender
OpenSolicitation

BOWLING CENTER AND F&B UPGRADES

COMMANDER NAVY INSTALLATIONS CMDDEPT OF DEFENSE / DEPT OF THE NAVY / COMMANDER NAVY INSTALLATIONS CMD

AI quick read

Get a plain-English summary, the key facts a bidder needs, and who it's a fit for.

Posted
Jun 1, 2026
Response deadline
Jun 16, 2026, 4:00 PM EDT
Due in 10 days
Value
Category
Commercial Building
NAICS
236220
PSC / Class
Z2JZ
Set-aside
Place of performance
El Centro, California
Solicitation #
NAVMWR-26-R-0038
Archive date
Jul 1, 2026

Search tags

Market context

Open in NAICS 236220
1,026
23 in California
Typical award (NAICS)
$10,143,364
median of 250 awards
Recent winners
4

Description

The project includes all design and construction necessary to renovate and modernize the eight (8) lane Bowling Center (Bldg. 485) to include replacement of the existing pinsetter unit with new pinsetter unit to include string bowling, electronic gaming area and food operation including all demolition, installation, renovation, temporary construction and restoration necessary to produce a complete and useable facility. The Work includes, but not limited to: 1. Site Investigation: The Contractor shall provide all surveys and perform all necessary site investigation utility locates (including, but not limited to, sub-surface utility �pot holing�) as required to complete the design and/or construction of the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Contracting Officer�s Representative (COR). 2. Site Development and Design: The Contractor shall provide complete architectural, civil, structural, mechanical, electrical, landscape and fire protection designs, required to construct the facility in accordance with all codes, laws and requirements. The Contractor shall refer to Section H for additional information regarding design submittal requirements. 3. Materials: The Contractor shall provide all materials, furnishings, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging, delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work. Additional information provided in attached RFP.