OpenSolicitation
BOWLING CENTER AND F&B UPGRADES
COMMANDER NAVY INSTALLATIONS CMDDEPT OF DEFENSE / DEPT OF THE NAVY / COMMANDER NAVY INSTALLATIONS CMD
AI quick read
Get a plain-English summary, the key facts a bidder needs, and who it's a fit for.
- Posted
- Jun 1, 2026
- Response deadline
- Jun 16, 2026, 4:00 PM EDT
- Due in 10 days
- Value
- —
- Category
- Commercial Building
- NAICS
- 236220
- PSC / Class
- Z2JZ
- Set-aside
- —
- Place of performance
- El Centro, California
- Solicitation #
- NAVMWR-26-R-0038
- Archive date
- Jul 1, 2026
Search tags
Market context
- Open in NAICS 236220
- 1,026
- 23 in California
- Typical award (NAICS)
- $10,143,364
- median of 250 awards
- Recent winners
- 4
Recent incumbents in this NAICS · California
Description
The project includes all design and construction necessary to renovate and modernize the eight (8) lane Bowling Center (Bldg. 485) to include replacement of the existing pinsetter unit with new pinsetter unit to include string bowling, electronic gaming area and food operation including all demolition, installation, renovation, temporary construction and restoration necessary to produce a complete and useable facility. The Work includes, but not limited to: 1. Site Investigation: The Contractor shall provide all surveys and perform all necessary site investigation utility locates (including, but not limited to, sub-surface utility �pot holing�) as required to complete the design and/or construction of the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Contracting Officer�s Representative (COR). 2. Site Development and Design: The Contractor shall provide complete architectural, civil, structural, mechanical, electrical, landscape and fire protection designs, required to construct the facility in accordance with all codes, laws and requirements. The Contractor shall refer to Section H for additional information regarding design submittal requirements. 3. Materials: The Contractor shall provide all materials, furnishings, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging, delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work. Additional information provided in attached RFP.